Solar charging, delivered turnkey.
We engineer, permit, build and commission EV charging sites, then hand them over to the owner. You own the chargers and the revenue; we stand behind the work.
For gas station owners
Charging belongs where drivers already stop. A solar canopy turns unused parking into a second fuel business.
A new revenue line
Charging sessions bring income from drivers who would otherwise pass by, without changing how you run the pumps.
More time in the store
A charge takes longer than a fill-up. Drivers who wait walk inside for coffee, food and the rest of what you sell.
Energy from your own roof
The canopy's solar array generates power on your own lot, and battery storage holds it on site, with the grid as backup.
Designed for owners
We work directly with property owners who make the decision, from first survey to handover.
| Station | Solar | Charging |
|---|---|---|
| Four-pump station | 10 kW solar canopy | Four EV chargers |
| Eight-pump station | 15 kW solar canopy | Chargers sized to the site |
For public fleets
Massachusetts is moving its fleet to electric. Agencies need chargers installed correctly, documented fully and delivered on a public contract.
Statewide contract VEH122
Suryatech is a listed vendor on Massachusetts statewide contract VEH122 for EV charging. Eligible public entities can request a scope of work and quote from us through the contract.
Level 2 and DC fast charging
From Level 2 pedestals for overnight depot charging to DC fast chargers for vehicles that need to turn around quickly.
A complete scope of work
Site plan, equipment, stamped drawings, permits, utility coordination, installation and commissioning in one proposal.
The system
Three parts, engineered together so the site works as one installation.
Solar canopy
A freestanding steel structure with glass solar modules over the parking bays. It generates power through the day and shades the cars beneath it.
Battery storage
A battery cabinet holds solar energy on site until a car needs it, with the grid as backup.
Fast charging
Level 2 posts for longer stays and DC fast chargers for quick stops, specified for the site and the traffic it sees.
How a project runs
Every project follows the same path, whether it is a single gas station or a fleet depot.
Site assessment
We walk the lot, review the electrical service and confirm where the canopy and chargers fit.
Design and engineering
Stamped drawings from our licensed engineers, with the equipment specified for your site.
Permits and utility application
We file with the town and the utility and keep the application moving. The utility sets its own schedule; we track it for you.
Construction
Foundations, canopy, trenching, chargers and landscaping, with vetted subcontractors under our management.
Commissioning and handover
Chargers tested, energized and handed over with documentation and training.
Warranty
Three years on the product and five years on workmanship, with one number to call.
Backed after handover
- Three years
- Product warranty on the installed equipment.
- Five years
- Workmanship warranty on our installation.
Warranty terms are set out in each contract.
Tell us about your site.
Share the address and what you have in mind. We will review the lot and the electrical service and come back with a design.

